Home > Buy Now > Generators > Other Generators > Second Power Plant-100MW
 


Shenzhen Teweite Mechanical&Electronic Equipment Co.,Ltd.
 
icon Products

line

icon Company Profile
icon Selling Leads

line

 
Contact us
Shenzhen Teweite Mechanical&Electronic Equipment Co.,Ltd.
[China]
Address:
Nearby Eastern Gate of Bingkeng Community Nanyue Village, Longgang Subdistrict, Shenzhen Shenzhen Guangdong China
Phone:
86-0755-89901385
Contact name:
Lin Xu , Director
Inquire now










Shenzhen Teweite Mechanical&Electronic Equipment Co.,Ltd.



 
Products

Second Power Plant-100MW

Inquire now

Second Power Plant-100MW

Click to enlarge image

 Model Number PG6551B/1

Description:

 

This power plant was founded in February of 1991 confirmed by the Ministry of Trade and Economy and the government of Shenzhen City. It is one of main gas turbine power plants of Shenzhen and it takes on chief power supply task for Shenzhen City. No.A power plant has two sets of 6B gas turbine and the supporting gas-steam combined cycle unit composed of waste heat boiler and turbo-generator.

I.     No.1 and No.2 gas turbines
No.1 gas turbine is PG6531B manufactured by Nanjing Turbine& Electric Machinery (Group) Co., Ltd., it was single cycled and commercially run in August of 1992.
The turbine type of No.1 gas turbine is single shaft and axial flow with 3 grades. The cylinder is horizontal mid-separate surface and it is cooled by the air. The compressor is IGV continuously adjusted and axial flow type and its pressure ratio is 11:7. The inlet is air filter device. The combustor of the gas turbine is adverse current can type and there are 10 combustors. The gas turbine is ignited through exited high pressure electrode type spark plug and there are 2 igniters. The flame detector is ultraviolet photoconductive and there are 4 flame detectors.
No.1 gas turbine is started through diesel engine and the starting diesel engine is DETROIT 12 V71 T with 630 horsepower and the maximum rotational speed is 2300 rpm. It is burned by light diesel oil and the diesel engine is started through direct current motor. The gas turbine is started through the diesel engine very conveniently in black start areas.
The main equipments of No.1 gas turbine are assistant gearbox, hydraulic ratcheting pump, load gearbox, main lubricating oil pump, AC assistant lubricating oil pump, DC emergency lubricating oil pump, lubricating oil cooler, fuel oil filtration and lubricating oil filtration, etc.
The control system for the gas turbine is controlled by MARK 4 with unit over-speed protection, bearing vibration alarm and protection, overheating alarm and protection, it has reliable and stable performance.


No.2 unit is PG 6531 gas turbine completely introduced from England John. Brown Engineering Limited. Company and manufactured by America GE Company. It was commercially run in December of 2000.

The turbine type of No.2 gas turbine is single shaft and axial flow with 3 grades. The cylinder is horizontal mid-separate surface and it is cooled by the air. The compressor is IGV continuously adjusted and axial flow type and its pressure ratio is 11:7. The inlet is air filter device. The combustor of the gas turbine is adverse current can type and there are 10 combustors. The gas turbine is ignited through exited high pressure electrode type spark plug and there are 2 igniters. The flame detector is ultraviolet photoconductive and there are 4 flame detectors.

Additional: No.2 turbine of the plant has been changed from oil to steam in September of 2006, after which, the unit has been run normally.

I.  Gas Turbine Specification

Turbine No.

Turbine Model

Brand Output (Mw)

Heat Consumption
Kj/kwh

Exhaust Temperature ℃

Delivery Time

Manufacturer

#1 turbine

PG6531B

36.5

11630

543

1992.8

Nanjing Turbine& Electric Machinery (Group) Co., Ltd.

#2 turbine

PG6531

36.5

11630

543

1994.12

England JBE

II. Waste Heat Boiler Specification

Boiler No.

Boiler Model

Rated Evaporation (t/h)

Rated Steam Pressure (bar)

Rated Steam Temperature (℃)

Delivery Time

Manufacturer

#1 boiler

Q377/535-62
-3.8/445

62

38.2

445±10

97.1

Harbin Boiler Co., Ltd

#2 boiler

-

66

40

445

94.12

Holland fasfl

III.  Turbine Specification

Turbine No.

Turbine Model

Brand Output (Mw)

Rated Steam Pressure (bar)

Rated Temperature
(℃)

Delivery Time

Manufacturer

#3 turbine

NK50/71/0--3Da

16.88

39.79

445

94.12

Germany Siemens

#4 turbine

L15-3.43

15

38

450

00.12

Nanjing Turbine& Electric
Machinery (Group) Co., Ltd.

IV. Motor Specification:

Motor No.

Model

Rated Volume (MW)

Stator Pressure (KV)

Cooling Medium

Delivery Date

Manufacturer

1# motor

QFR-36-2

36.0

10.5

Air

1992.8

Nanjing Turbine& Electric Machinery (Group) Co., Ltd.

2# motor

BSGMD

36.7

10.5

Air

1990.3

BRUSH

3# motor

BSGMD131260/4

16.68

10.5

Air

1994.12

BRUSH

4# motor

QFW-150-2

15

10.5

Air

2000.12

Nanjing Turbine& Electric Machinery (Group) Co., Ltd.

V. 110KV Main Transformer (No-load Voltage Regulation)

No.

Model

Impedance Pressure %

Coupling Mode

Cooling Mode

Delivery Date

Manufacturer

1# main transformer

SF7-50000/110

9.86

YND11

ONAN
ONAF

1992.8

Baoding Transformer

2# main transformer

SF7-50000/110

9.67

YND11

OFAN

1988.8

Shenyang Transformer

3# main transformer

SF7-20000/110

10.5

YND11

ONAN
ONAF

1994.12

Shenyang Transformer

4# main transformer

SF7-20000/110

10.5

YND11

ONAN
ONAF

2000.10

Baoding Transformer